Sunday, June 6, 2010

1st strip is on! It has been a long wait for this moment. Only 60 strips more to go.
Thanks to Mark. I have 3000 linear feet of clear cedar coved and beaded
forms are set up. It looks like a canoe
Building the ultimate strip.
Two strips that are each 20 feet long took a month to make. I'm proud of these.
Seats are made and will be caned.

forms

Forms taking shape
cut on bandsaw and sanded